Muhammad Müller
A.C.R.E.

Präsentation des EUROPA-Projekts basis.tunnel


Exhibition

Dates
9.10.–31.12.2004

Details
Eröffnung:
9.10.2004
herbst-Parcours 6.11.2004

Location
Werkstadt Graz
Graz

Production specifics
Kooperation medienkunstlabor, Kunsthaus Graz, Koroska galerija likovnih umetnosti Slovenj Gradec, xxkunstkabel

The base.tunnel runs between Werkstadt Graz and Koroska galerija likovnih umetnosti in Slovenj Gradec. 67900 metres as the crow flies. The cellar rooms located at both ends are a physical component of the base.tunnel. The base.tunnel, most of which still needs to be uncovered, is a symbol of an underground link that is already well-frequented on the intellectual level. Supposing that one digger were to dig away one cubic metre of soil per month at both ends, it would take 5658 years to complete the base.tunnel.

Künstlerin / Künstler / Gruppe: Muhammad Müller

Retrospective
Retrospective
Retrospective